MARRIOTT CASE STUDIES

URBAN CASE STUDY

JW MARRIOTT WASHINGTON, D.C.

PROJECT SIZE
180 kilowatts (kW)

PROJECT ANNUAL SAVINGS
$21,000

PROJECTED IRR
Mid Teens

RESORT CASE STUDY

MARRIOTT WAILEA BEACH CLUB MAUI

PROJECT SIZE
Phase 1: 450 kilowatts (kW)
Phase 2: 800 kilowatts (kW)

PROJECTED SAVINGS
$230,000 first year
$8.4 million over 25 years


PROJECTED IRR
18% – 20% 

ENERGY PRODUCTION
712,000 kW hours annually
17,800,000 kW hours over 25 years

HOTEL CONFERENCE CENTER CASE STUDY

GAYLORD NATIONAL WASHINGTON, DC

PROJECT SIZE
2.9 MW

CARBON REDUCTION
2,500 tons / year

PROJECTED IRR
10-11%